 Preliminary design for the Port Victoria-Sisenye-Budalangi-Rwambwa Water Supply Project has been completed. The proposed scope of the project includes Expansion of Port Victoria and Sisenye Water Supply system by construction of additional system of capacities 6800m3/day and 3,900m3/day respectively. The ...
The detailed designs for the Bungoma-Kibabii Sewerage System have been completed. The project is estimated to cost is Kshs 2 Billion. Awaits funding ...
Kabiyet –Kaiboi Water Supply Project is proposed to serve Kabiyet, Kaiboi, Sarora, Kiptangus and adjacent locations. The project is estimated Cost is Kshs 2.1 Billion. Designs are completed. Awaits funding ...
Bukura-Butere-Khwisero Water Supply Project is proposed to serve parts of Vihiga county, Sigalagala, Lunza, Bukura, Butere and Khwisero centres. Designs completed and estimated to cost about Kshs 2 Billion. Awaits funding ...
The proposed Moi’s Bridge-Matunda Water and Sanitation Project is proposed to serve Moi's Bridge and Matunda as well as Kachibora. The project involves construction of new gravity scheme with a capacity of 11,000m3/day and sewerage systems for Moi's Bridge and ...
The proposed Malava Water Supply Project is meant to serve Malava town and its environs and involves construction of Gravity Water Scheme of 3,200m3/day and two independent schemes of 1,000m3/day on Kivaywa and Namagara Rivers. The project is estimated to ...
The proposed Sosio-Teldet Water Supply Project involves Construction of new Gravy System of capacity 12, 500m3/day with its source on Sosio River together with a transmission and distribution network of 30km long and storage tanks. It will serve mainly Trans-Nzoia ...
The Mt Elgon-Bungoma-Busia Gravity System is proposed to serve parts of Busia and Bungoma Counties and involves construction of a dam and Treatment works of a capacity of  82,000m3/day along Malakisi River and transmission mains to Busia and Bungoma at ...